Church Steeple, Spire, and Cross Placement by Helicopter
Documented US steeples run 2,600 to 23,000 lb, all inside the civil fleet. The crane still wins, because a steeple set has to be held in place while it is bolted.
The Library
Load charts, cost anatomy, and regulatory explainers for the estimators, engineers, and project managers who plan heavy lift work. Figures are verified and regulations are cited, so the numbers hold up when you take them into a bid.
Filtered by tag: Congested Area · Clear filter
Documented US steeples run 2,600 to 23,000 lb, all inside the civil fleet. The crane still wins, because a steeple set has to be held in place while it is bolted.