Sikorsky S-55, S-58 and H-34: The Family Behind the S-58T
The S-55 led to the larger S-58 and military H-34 family. The turbine S-58T still appears in lift fleets, with payload limits tied to the aircraft and job.
The Library
Load charts, cost anatomy, and regulatory explainers for the estimators, engineers, and project managers who plan heavy lift work. Figures are verified and regulations are cited, so the numbers hold up when you take them into a bid.
Filtered by tag: Lift Planning · Clear filter
The S-55 led to the larger S-58 and military H-34 family. The turbine S-58T still appears in lift fleets, with payload limits tied to the aircraft and job.
Helicopter loads per hour depend on complete cycle time and usable work minutes. Compare published HVAC cases with clearly labeled planning calculations.
A rooftop HVAC helicopter lift checklist covering unit weights, handling instructions and curb readiness, with site protection and day-of briefing checks.
Helicopter lift contracts define minimum hours, ferry charges and delay costs. Compare billing terms and document changes before committing to a lift date.
Helicopter lifts stop for visibility, wind, heat and storms. The pilot decides under 14 CFR 91.3, and a hot afternoon can cost about 960 lb of hook capacity.
OSHA requires loose gear within 100 ft of helicopter lift points to be secured, yet outwash from a 12.6 t helicopter stays near 34 mph almost 200 ft out.
A crane wins when a pick exceeds the 28,000 lb civil helicopter ceiling, must be held while it is bolted, goes under cover, or sits beside open, firm ground.
OSHA 1926.551(h) puts load size, weight and connection on the helicopter operator. The pilot in command has final authority. The rest is contract.
A slung load swings, spins, and bounces, and each has its own driver and its own fix. Line length, drogues and fins, and collective grip are the controls.
Part 133 never mentions night. A lift after dark runs on the same certificate, and what changes comes from Part 91 minimums, pilot recency, and OSHA lighting.
A tower flies only if it was designed to. The practical civil ceiling is near 20,000 lb per pick, which decides guyed versus self-supporting in design.
A helicopter lift is won in the planning. The full pre-lift process, from site survey and load engineering to the FAA-reviewed lift plan and load sign-off.